Calculate concrete slab volume in cubic yards or meters, plus bags, rebar, gravel base, and cost. Instant estimates with waste margin for patios and driveways.
Rec bagged mix body
Desc contraction joints
Desc subgrade undulation
Calculate concrete slab volume in cubic yards or meters, plus bags, rebar, gravel base, and cost. Instant estimates with waste margin for patios and driveways.
Planar horizontal dimensions of the slab formwork in feet or meters. ACI 360R guidelines recommend maintaining aspect ratios (length-to-width) below 1.5:1 for individual slab panels between contraction joints to prevent longitudinal drying shrinkage cracking.
Vertical thickness of the poured concrete slab. Official residential building code (IRC Section R506 / ACI 332) mandates a minimum nominal thickness of 3.5 inches (90 mm) for pedestrian walkways and non-load-bearing patios, 4 inches (100 mm) for storage sheds, 5 to 6 inches (125 to 150 mm) for vehicular driveways, and 8 inches (200 mm) for heavy commercial or RV pads.
Compounded volume percentage added to theoretical solid geometry. Accounts for uncompacted subgrade dips, rutting, excavator grading variations (each 1/4-inch subgrade depression adds ~6.25% to a 4-inch slab), and hydrostatic outward bowing of wooden perimeter forms during screeding. Professional contractors specify 10% for prepared soil and 15% for rocky or unlevel ground.
Depth of crushed stone (#57 limestone or dense graded aggregate / crusher run) installed beneath the slab. Provides uniform compressive bearing capacity, breaks capillary action to prevent moisture wicking into the concrete, and allows frost-heave drainage in freeze-thaw climatic regions.
Specification for deformed steel rebar (ASTM A615 Grade 60) or welded wire reinforcement (ASTM A1064). Rebar sizes #3 (3/8" / 10mm) and #4 (1/2" / 12mm) placed on chairs at 12 to 18-inch centers supply tensile resistance against slab differential settlement, bridge subgrade voids, and keep hairline shrinkage cracks tightly interlocked.
Standard compressive strength measured after 28 days of moist curing (ASTM C39). ACI 318 classifies concrete applications: 2,500 PSI for basic footings, 3,000–3,500 PSI for residential patios and sidewalks, 4,000 PSI for exterior garage floors and driveways subject to freeze-thaw and deicing salts, and 4,500–5,000 PSI for heavy industrial slabs.
Never order concrete based purely on mathematical form dimensions without a 10% to 12% waste contingency. An excavation depression of just 1/4 inch (6.35 mm) below grade across a 20x20 ft driveway consumes an extra 0.31 cubic yards (8.4 cubic feet or fourteen 80-lb bags). If your subbase is uneven, you will run short on the final truckload, resulting in a disastrous cold joint in the middle of your pour.
A standard 10x10 ft patio at 4 inches thick requires 1.36 cubic yards with waste—equivalent to 62 eighty-pound bags (4,960 lbs of dry material). Hand-mixing or drum-mixing 60+ bags takes 3 to 5 hours for two people, during which early batches begin initial set, creating cold joints and severe surface delamination. Any pour exceeding 1.5 cubic yards (~65 bags) is physically and financially superior with a ready-mix truck, even with short-load fees.
Concrete shrinks approximately 1/16 inch per 10 linear feet as excess mix water evaporates. To prevent random spiderweb cracking, saw-cut or tool contraction joints at a spacing in feet no greater than 2.5 times the slab thickness in inches. For a 4-inch slab, maximum joint spacing is 10 feet (4 × 2.5); for a 5-inch slab, 12.5 feet. Cut joints to a depth of at least 1/4 the slab thickness (1 inch deep on a 4-inch slab) within 6 to 18 hours of finishing.
Pulling rebar up with a rake during the pour is a dangerous shortcut that fails in practice—workers step on the steel as they screed, pushing it back into the dirt. Rebar resting on soil or vapor barrier provides 0% tensile reinforcement and accelerates subterranean corrosion. Always support rebar grids on plastic rebar chairs or 2-inch concrete dobies spaced every 3 feet so the steel is permanently locked into the center-to-lower third of the slab.
Concrete does not dry to harden; it cures through an exothermic chemical reaction called hydration. Allowing the surface to dry out in the first 72 hours stops hydration prematurely, reducing compressive strength by up to 50% and causing surface dusting and crazing. Apply a spray-on curing compound or keep the slab continuously misted under plastic sheeting or wet burlap for at least 5 to 7 days.
If the transit mixer empties before the forms are full, immediately install an emergency bulkhead (a 2x4 board placed upright across the slab width) at the location of your nearest planned contraction joint. Strike off and consolidate the concrete up to the bulkhead. Drill holes and insert 18-inch rebar dowels through the board to tie into the subsequent pour. When the second batch arrives, apply a liquid concrete bonding adhesive to the cold joint face before pouring.
Caused when surface water evaporates faster than internal bleed water rises to replace it (evaporation rate exceeding 0.2 lbs/sq ft/hr, common on warm, windy, or low-humidity days). If fine tearing appears during bull floating, immediately erect windbreaks, apply an aliphatic alcohol evaporation retarder spray across the surface, and avoid over-working bleed water into the paste, which weakens the surface skin.
Curling occurs when the top surface dries and shrinks while the moist bottom surface against the subbase remains dimensionally stable, pulling the corners and edges upward. Prevent curling by using a low-water-cement ratio mix (maximum 0.45 w/c), maximizing coarse aggregate size (1.5-inch stone), installing contraction joints at tight intervals (10 to 12 feet), and thoroughly moist-curing the top surface.
Pouring concrete directly over uncompacted backfill dirt or topsoil results in subgrade settlement voids beneath the slab when loaded by vehicles. Always excavate organic topsoil down to undisturbed native subgrade, backfill with a minimum 4 inches of open-graded #57 stone or crushed aggregate, and consolidate in 2-inch lifts using a mechanical vibrating plate compactor before placing forms.
To calculate concrete volume for a rectangular slab, multiply Length (in feet) by Width (in feet) by Thickness (in feet, which is inches divided by 12), then divide by 27 to convert cubic feet into Cubic Yards. For example, a 10 ft by 10 ft patio at 4 inches thick is calculated as: 10 × 10 × (4 / 12) = 33.33 cubic feet ÷ 27 = 1.23 cubic yards. Always add a 10% waste contingency (1.23 × 1.10 = 1.36 cubic yards) to account for subgrade dips, form deflection, and spillage.
For a 10x10 ft slab at 4 inches thick, you need 62 bags of 80-lb concrete (or 82 bags of 60-lb concrete) including a 10% safety margin. One standard 80-lb sack of pre-mixed concrete yields 0.60 cubic feet. The net volume of a 10x10 slab at 4 inches is 33.33 cubic feet; adding a 10% contingency equals 36.67 cubic feet. Dividing 36.67 by 0.60 yields 61.1, which rounds up to 62 sacks.
Under ACI 332 residential standards, a 4-inch (100 mm) slab thickness is recommended for pedestrian patios, sidewalks, and light storage sheds under 2,000 lbs. For residential driveways and two-car garages carrying standard passenger cars and light SUVs, a 5 to 6-inch (125 to 150 mm) slab is required to withstand repeated dynamic wheel axle loads. Heavy-duty applications, such as motorhome/RV parking pads or workshop machinery slabs, require 6 to 8 inches (150 to 200 mm) with a bidirectional rebar grid.
For projects under 1.0 to 1.5 cubic yards (up to ~60 bags of 80 lb), pre-mixed bags are cheaper, costing approximately $250 to $350 in materials versus a ready-mix truck minimum order charge of $500 to $750 (which includes short-load fees of $150 to $250 for orders under 4–5 yards). For pours exceeding 1.5 to 2.0 cubic yards, ready-mix truck delivery is virtually equal in cost and vastly superior in quality, preventing cold joints and eliminating the back-breaking labor of hand-mixing thousands of pounds of concrete.
While unreinforced plain concrete is code-compliant for lightweight residential patios on stable soil, adding Welded Wire Mesh (6x6-W1.4/W1.4) or #3 (3/8") deformed rebar spaced 18 inches on center is highly recommended. Steel reinforcement does not prevent micro-cracks from forming, but it holds cracked sections tightly together, maintains aggregate interlock, and prevents slab displacement or uneven tripping hazards caused by frost heave or soil settlement.
A minimum of 4 inches (100 mm) of compacted crushed aggregate (such as #57 crushed limestone or dense graded road base) is required under exterior slabs. The gravel bed serves three critical engineering functions: it provides a uniform, non-yielding load-bearing platform, breaks capillary action so soil moisture cannot wick upward into the slab, and allows trapped subgrade water to drain freely during freeze-thaw cycles to prevent frost heaving.
Calculate creatine dosage for loading and daily maintenance based on body weight. Track muscle saturation curves, monohydrate vs HCL, and hydration targets.
Calculate potting soil volume for pots, planters, and raised beds. Convert quarts, cubic feet, and liters to exact bag counts with compaction and cost estimates.
Calculate roofing shingles, squares, and bundles with pitch multipliers, waste factor, ridge caps, starter shingles, nails, and material cost takeoff.
Free rental property ROI calculator to analyze real estate cash flow, cap rate, cash-on-cash return, and IRR. Project 30-year appreciation and rental yields.
Calculate Roth IRA growth and compound interest with annual IRS limits, catch-up age rules, inflation drag, and tax-free retirement withdrawal forecasts.
Calculate single and multiple event probabilities, odds ratios, conditional Bayes outcomes, and independent or mutually exclusive event series with steps.